Tasks in the past dissapear

Task, which is repeating - I don’t know, if it’s relevant, but I haven’t time to check this on non-reccuring tasks - and are in the past (delayed) dissapear in EMC tasks list.

Initially, if tasks is delayed like yesterday or 2 days, it is actually shown in “PAST” group. But after several days this group dissapear, even if tasks is still due. For example, I have reccuring task which is set on 10/03/2018 and it “dissapear” from EMC sth. like 14/03.

Hi Raven66.

I was not able to reproduce this. Maybe you can tell me where my method differs.

  1. Create a task with a due date of 2 days, and set it for repeating weekly.
  2. Advance system time 3 days.
  3. Advance system time 4 days.
  4. etc for 3 weeks

The task is showing in Today on the recurring date, or in The Past otherwise, but is always in the list even after the due date.

Hi Gary.
I began to think that this has nothing to do with due date and the past.

Tasks in EMC has tendency to disappear when they’re set on CalDAV server - I didn’t pinpointed particular problem with this yet, due to lack of time. But it is 100% sure problem with this specific configuration: CalDAV+repeating tasks

Interesting. I look forward to seeing what you come up with when you have the time.